Engineering Change Management
www.johnstark.com
Engineers get unhappy with an ECM system that doesn't work
This overloads them and patches consume a lot of their energy
As a consequence, innovation and new product design suffer
A corresponding part of their time is wasted
Home
|
Top of page
|
Front of Engineering Change Management section
Page last modified on February 18, 2000
Copyright 1999, 2000 by John Stark